Questions and Answers
Common questions about remodels, cabinets, countertops, permits and living at home during the work.
It depends on the scope. The City of Mesa requires a permit for structural, electrical, mechanical or plumbing changes. New countertops, paint and flooring alone don't need one. We tell you which side your project falls on after measuring.
On-site work for a full remodel usually runs several weeks, and cabinet lead time comes before that. Countertops are templated after the cabinets are set, which adds a short gap. Your estimate includes a week-by-week schedule.
If the cabinets are solid and the layout works, painting the cabinets and replacing the counters can be enough. If the room is closed off or short on storage, a remodel usually pays off more. We'll show you both.
Often, yes. Many Mesa ranch homes have a wall or pass-through between the two rooms. We check whether it carries load and plan a beam and permit if it does.
Kitchens all over Mesa, including Dobson Ranch, Las Sendas, Red Mountain Ranch, Eastmark, Alta Mesa and the neighborhoods around downtown.
Not usually. The City of Mesa lists updating countertops, painting and replacing flooring as work that doesn't need a permit. Moving plumbing, adding circuits or changing a structural wall does.
The City says residential permits are valid for 180 days after they're issued, so we file once the design and cabinet order are settled.
Not the kitchen itself, but you can stay home. We wall off the work area and help set up a temporary kitchen in the laundry room, dining room or garage.
Yes. Cabinet widths, the hood and any panel-ready doors depend on exact appliance models, so we like to have them chosen before ordering cabinets.